• sp
  • Business Outline
  • Press Releas
  • President's Message
  • Corporate Data
  • Contact US
JAPANESE
Home > Business Outline > Office > Marunouchi/Kyobashi Area > Marunouchi Trust Tower Main
Office

Office

PRINT

MARUNOUCHI TRUST TOWER MAIN

MARUNOUCHI TRUST TOWER MAIN
  • Inquiry Form

Location

1-8-3 Marunouchi, Chiyoda-ku, Tokyo
37 fl. above the ground, 4 fl. below the ground and two-story rooftop structure

Access

Tokyo Sta.
1 min on foot from Nihombashi Exit (JR Line)
2 min on foot from Yaesu North Exit (JR Line)

Otemachi Sta.
2 min on foot from B7 Exit(Tozai Line・Marunouchi Line・Hanzomon Line・ Chiyoda Line / Toei Mita Line)

Nihombashi Sta.
4 min on foot from A3 Exit (Ginza Line・Tozai Line / Toei Asakusa Line)

Standard Floor Plan

Standard Floor Plan Zoom

Access Map

Zoom

Rental space Outline

Rental area of typical floor 2,074.17m²(627.4tsubo)
Air conditioning [Around the core of the building]
Central air-conditioning system on each floor (variable air volume single duct system)
[Around the perimeter]
Convectors with wall-through heat pump units
Typical ceiling height 2,950mm(typical floor), 3,000mm(26 F)
Typical ceiling specification 600mm grid modular ceiling system
Typical floor load 500kg/m² (1,000kg/m² at heavy load zone), 1,000kg/m²(3F)
Typical floor specification Carpet tile over 150mm high free access floor (2, 4-26 F)
Carpet tile over 300mm high free access floor (3 F)
Electricity for computer 70VA/m²

Building Outline

Lot area 12,026.77m² (approx. 129,460 sq. ft.)
*the overall MARUNOUCHI TRUST CITY
Total floor area 115,379.68m² (approx. 1,241,980 sq. ft.)
Number of floors 37 fl. above the ground, 4 fl. below the ground and two-story rooftop structure
Building structure Steel-framed building(concrete filled steel tube) with partially steel-framed reinforced concrete structure (seismic response control structure)
Parking Self parking, two-story self parking and puzzle parking for 368 cars (Including North Tower)
*the overall MARUNOUCHI TRUST CITY
Primary use Office : 2-26F
Hotel : 27-37F
Shop : 2F
Building completed November 2008
Page UP